Confidential investor material01
Outright asset sale

Bjelajce
digital infrastructure
opportunity.

An established industrial campus in the Banja Luka region of Bosnia and Herzegovina, with proven electrical capacity and an opportunity for data-centre redevelopment.

Investor teaser · NDA materials available to qualified parties
01 / The opportunity02

Buy the entire asset.
Build the digital campus you need.

A fully formed industrial site—not a greenfield starting point—with proven power, redundant grid lines, existing utilities, buildings and internal infrastructure.

The asset is offered for outright sale. Data-centre conversion, design, delivery model and operating concept are for the acquirer to define.

02 / Site at a glance03

Scale already on site.

132,000
m² total site area

Owner-provided asset figure

62,000
m² reported buildings

Aggregate industrial building area

27
MW confirmed capacity

Existing electrical capacity

redundant 110 kV lines

Confirmed grid-feed configuration

Owner-provided site and building figures; title perimeter and detailed building condition form part of buyer diligence.

03 / Electrical foundation04

Power is the central asset.

On-site high-voltage substation equipment

27 MW confirmed capacity, served through redundant 110 kV grid lines and an on-site 110/20 kV substation.

The owner also reports an expansion path to 54 MW through a further permitted 27 MW. Detailed grid, transformer and delivery documentation is available for qualified-investor diligence.

Grid-feed redundancy is distinct from data-centre facility topology. The future facility’s resilience standard is an acquirer design decision.

04 / Industrial utility base05

Useful infrastructure
already exists.

Water treatment

A separate on-site water-treatment installation is visibly present.

Electrical rooms

Substation, MCC and load-centre facilities are shown in the site plan.

Site systems

Existing internal roads, drainage, generator facilities, offices and support buildings.

Water volume, quality, rights and suitability for a particular cooling design remain part of technical diligence.

05 / Redevelopment proposition06

Start with evidence.
Then configure for demand.

01Assess which existing buildings are worth retaining, rebuilding or replacing with purpose-built data halls.
02Validate fibre routes, market demand, planning path and the economics of an initial capacity block.
03Develop a phased campus strategy around a buyer’s target customer, technology and resilience requirements.

This is a data-centre real-estate and power-infrastructure redevelopment opportunity—not a claim that a data centre already exists.

06 / Site gallery07

Industrial campus,
seen on site.

Owner-provided recent site photographs.

07 / Utilities & support facilities08

Operational infrastructure
within the campus.

Images are visual reference only; capacity, condition and permitted use require diligence.

08 / Plans & asset context09

Physical footprint
and site context.

Plan images support discussion of site context only. Formal cadastral and title material controls the asset perimeter.

09 / Next step10

Evaluate the asset
with the facts.

Detailed technical materials and owner discussions are available to qualified investors under NDA.

bojan.sukalo@outlook.comlinkedin.com/in/bojansukalo

Banja Luka region, Bosnia and Herzegovina · This material is for discussion only and does not constitute an offer, warranty or representation.